Robust Roofing (470) 887-6637

How to Read a Roofing Estimate, Line by Line

Choosing and Paying3 min readBy Andrew Holt

Three bids arrive and they differ by thousands. The instinct is to assume someone is overcharging. Usually the truth is duller and more expensive: they are quoting different roofs. Here is how to read what is actually being sold, in the order it appears on a proposal.

Tear-off and what happens underneath

Layers of tear-off. The estimate should say how many existing layers come off and that disposal is included. If a bid quotes going over the existing roof instead, read our layover guide before you save that money.

Decking replacement policy. This is the single most important line in the document, because nobody knows how much rotten decking exists until the roof is open. You want a stated price per sheet and a commitment to show you what gets replaced. A bid that is silent here is a surprise invoice waiting to happen.

The water layers

Underlayment: the type and weight, across the whole field. Ice-and-water barrier: where exactly it goes, at minimum in valleys and around penetrations. These are invisible the day the job ends and decisive in year eight, which is precisely why they are where cheap bids economize.

Edges, penetrations, and the small metal

Ventilation and fastening

Ventilation should appear as an actual plan: ridge vent footage, intake at the soffits, and baffles if insulation is choking the eaves. A roof installed over a starved attic ages early and can void manufacturer coverage, which our ventilation guide covers. Nailing should specify the pattern, commonly six nails per shingle for wind performance in our market. It sounds like a triviality. It is the difference between a warranty that holds and one the manufacturer walks away from.

The parts people skip to

The four questions that sort any three bids

Ask each bidder: what happens when you find bad decking, is the flashing new or reused, what is your ventilation plan, and what exactly does your workmanship warranty cover. The answers, more than the totals, tell you which roof you are actually buying. A good contractor answers all four without hesitating, and puts them in the proposal without being asked.

Quick answers

Why do two roofing estimates differ by thousands?
Almost always scope, not greed. Tear-off versus layover, decking replacement policy, new flashing versus reused, underlayment quality, ventilation work, and cleanup standards all live under the same headline price.
What should always be itemized in a roofing estimate?
Layers of tear-off, per-sheet decking price, underlayment type and where ice-and-water goes, drip edge, starter and ridge cap products, flashing and boots, ventilation, nailing pattern, cleanup, permit, warranty terms, and the payment schedule.
What payment terms are normal?
A modest deposit at most, progress payments tied to milestones, and the balance at completion. Large cash deposits demanded on the spot are a red flag, and on insurance jobs the schedule should match how your carrier and mortgage servicer release funds.

Keep reading

Comparing Bids Without Getting PlayedRead the guideDecoding the Warranty SectionRead the guide
Schedule Your Free Inspection Call (470) 887-6637
Robust Roofing · Residential roofing across North Georgia
chooserobust.com · Service Areas · All Guides · (470) 88-ROOFS
Serving Roswell, Marietta, Alpharetta, Acworth, Cumming and 10 more North Georgia cities